Reno at the Rusty C.
https://www.atfund.gatech.edu/russ-chandler-stadium-renovation-phase-ii
Last pitch of 2020 season they start renovation. To open for 2021 season I think.
Also thought they were doing something with the trees so the Frat Houses could watch....
The pitching/video lab is going to be LEGIT!
Russ Chandler Stadium Renovation Phase II
THE VISION
Phase II renovations for Russ Chandler Stadium are driven by our vision for Georgia Tech baseball: to enhance player development, to improve the fan experience, and to celebrate Tech's rich baseball history.
The concourse level will feature an atrium that also functions as a Georgia Tech Baseball Hall of Fame. It will be the first thing fans see when they enter the stadium - an iconic point of entry - intended to serve as both a welcome and a celebration. The atrium is also designed to convert into a 40-seat teaching auditorium on non-game days.
Other features in the planned upgrade include a new outdoor plaza; a new high-tech scoreboard; all-new, expanded restroom facilities and concessions (including a premium club area); a new alumni locker room; and an expanded training facility that will be open year-round for Tech players, and available to alumni/Major League Baseball players during the offseason.
To greatly enhance player development functions within the stadium, Phase II renovations also include a training center, three 20-foot-wide batting cages, two 10-foot-wide pitching tunnels, and a video analysis room. The batting cages and pitching tunnels will be divided by retractable netting with turf flooring and a raised pitching mound.