dressedcheeseside
Helluva Engineer
- Messages
- 14,218
But yet who built those expectations?I think the problem a lot of people here have is that this analogy is off.
It isn't: "Well boss, this company has always been like this so why shoot for these large increases in sales? We are what we are, boss. History says so."
It's "Comrades! Don't tell us at GOSPLAN what the limits on our engineering expertise or our present resource production are! Bolsheviks can storm any fortress!"
This got a great country into a lot of trouble. It isn't that we shouldn't be optimistic. It's that we have to be ready for a long haul while we build - wait for it - the infrastructure we need to recruit up to Tech's potential. And we need to remember that that potential is not unlimited. If we stick to that and stay reasonably patient, I don't doubt that we'll have success under Coach. If not, we'll toss him because he can't fulfill our overheated expectations.